Tank & Line Cleaning
Procedures for flushing sedimentation basins and cleaning chemical lines.
Sedimentation Basin Flush
Frequency: As needed (typically seasonal) or when sludge blanket rises.
- Setup:
- Isolate Basin Effluent valves.
- Raise plant elevation to ~21 inches.
- Open influent for the target Waste Lagoon.
- Flush:
- Crack the Drain valve (15-20 turns) to charge the line.
- Slowly open fully (15-20 turns every 10 mins).
- Wash Down:
- Use plant elevation to backflow water from the filter channel.
- Use hose streams to clean corners and drain openings.
- Restore:
- Close drain and slowly refill over 48 hours.
- Note: Refill rate should be ~1 MGD > Outflow.
Lime Line Cleaning
Trigger: When rotating to a new tank or if lines clog.
- Flush:
- Hook water line to the empty tank's dosing pump.
- Close finished system valve; Open flush valve.
- Run pump at Max Speed to reverse flow and flush lines.
- Finish:
- Flush until water runs clear (approx. 2 mins).
- Re-connect dosing pump to new tank.